4 |
Unscrew adjuster to minimum setting.
 |
 |
 |
5 |
Raise pressure until valve functions
note performance of reseat. Repeat in increments of 2,000 PSI to the valve’s upper limit.
Reseat must remain within 5% of cracking pressure at all times. Valves that fail to reseat
within 5% are to be reworked.
 |
 |
 |
6 |
Hold on pressure for approximately 2 minutes.
Check for pressure decay and leakage.
 |
 |
 |
7 |
Remove from test rig and immediately plug both ports.
 |
 |
 |
8 |
Ensure that Test Certificate log is completed and
mark valve with the information contained on the production documentation. Affix CE mark.
 |
 |
 |
9 |
Pass to inspection.

 |
 |